MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday., This news data comes from:http://rer-pp-wy-ww.gyglfs.com

Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- Taylor Swift, Travis Kelce engaged
- MMDA inks deal with DBM for G-3 program
- No winner in Ultra, Megalotto draws for Sept 5
- SSS hails Marcos, Recto for initiating pension reforms, including one to be rolled out in Sept
- Dizon to abolish DPWH internal special investigation team created to look into the flood control anomalies
- Bonoan freezes DPWH travel passes
- PH Navy spots 20 Chinese ships near BRP Sierra Madre
- Israel flattens high-rise as it tells Gaza City residents to flee
- Petitioners challenge claim NAIA fees lowest in Southeast Asia
- US Spirit Airlines files for bankruptcy again